ADDIMIX ST product line for Soil Stabilization





Energy Saving House System
which saves 30% construction time
and 70% of the energy consumotion
due to the insulation of the walls.


Why the system saves 30% construction time and Money?
• Due to the very light building blocks of max 1.5 kg made of polystyrol the work is not difficult and very fast and you
need less construction workers and you save money.
• We build the statics without the conventional Skilett construction (no pillars).
• All walls are load-bearing walls.This means that the foundation work is not so complex and saves time and money.
As a result, the design is felxiebler and there are no disturbing pillars and beams that restrict the room design.

Thermoblock Construction Time 300m2 three floor‘s
Conventional Construction Time 300m2 three floor‘s
Comparison of conventional & Themrmoblock method
Advantages for house owner:
-
Short monthly charges for renting the current apartment and loan for the new house during the long construction period
-
Due to the insolated walls you save 70% of your monthly electricity costs for air conditioning.
-
Sound insolation on RW = 45 dB guarantee a quite living.
-
No quality defects after short time
-
No cracks in the facade
-
Logn warranty period
-
Increase the value of your home by product quality and long warranty service.
-
Flood Savety
-
Fire-safe construction
Advantages construction companies:
-
Short construction time.
-
Lower labour costs
-
Lower costs for machinery
-
Return of Investment in a short time due to the rapid construction period.
Disadvantages for House owner:
-
Longer monthly charges for renting the current apartment and loan for the new house during the long construction period
-
The building has no insulation against heat and causes more costs for air conditioning
-
No sound insulation against outside noise
-
Quality defects after a short time
-
Cracks in the facade
-
Short warranty period
-
Loss of overall value
Disadvantages construction companies:
-
Long construction time.
-
Higher labour costs
-
Higher costs for machinery
-
Return of Investment in takes much longer due to the long construction period.
3,2 MONTH
1,5 MONTH







THERMOBLOCK Construction System
is made of foamed NEOPOR® with a density of 27 kg per m3 and has
isolier value of U - 11 and it‘s fire resistant according the DIN 4102-1 and EN 13501-1
Product description
There are two different wall dimensions:
25 cm x 100 cm with 8 cm concrete core for one floor bulidings
-
Size: 25 cm Element
-
100 cm x 25 cm x 25 cm
-
37 cm x 100 cm with 20 cm concret up to 12 floor buildings
-
Size: 37 cm Element
-
100 cm x 37 cm x 25 cm
-
Weight: 1.5 kg
-
Isolation: U 11
-
Sound isolation: Rw = 45 dB, Dübendorf
-
Reaction to Fire: A1/B1 EN 13501-1 und DIN 4102-1
Disadvantages construction companies:
-
Long construction time.
-
Higher labour costs
-
Higher costs for machinery
-
Return of Investment in takes much longer due to the long construction period.









Thermoblock Construction Time 300m2 three floor‘s
Conventional Construction Time 300m2 three floor‘s
Comparison of conventional & Themrmoblock method
1,5 MONTH
Advantages for house owner:
-
Short monthly charges for renting the current apartment and loan for the new house during the long construction period
-
Due to the insolated walls you save 70% of your monthly electricity costs for air conditioning.
-
Sound insolation on RW = 45 dB guarantee a quite living.
-
No quality defects after short time
-
No cracks in the facade
-
Logn warranty period
-
Increase the value of your home by product quality and long warranty service.
-
Flood Savety
-
Fire-safe construction
Advantages construction companies:
-
Short construction time.
-
Lower labour costs
-
Lower costs for machinery
-
Return of Investment in a short time due to the rapid construction period.
3,2 MONTH
Disadvantages for House owner:
-
Longer monthly charges for renting the current apartment and loan for the new house during the long construction period
-
The building has no insulation against heat and causes more costs for air conditioning
-
No sound insulation against outside noise
-
Quality defects after a short time
-
Cracks in the facade
-
Short warranty period
-
Loss of overall value
Disadvantages construction companies:
-
Long construction time.
-
Higher labour costs
-
Higher costs for machinery
-
Return of Investment in takes much longer due to the long construction period.